The Diane Bryant Engineering Student Design Center officially opened on May 5, 2023
Bryant '85, contributed $6.5 million to the project — the largest outright gift ever by an individual to the College of Engineering. Construction of the 23,000-square-foot space took just under two years at a cost of $22 million — all donor funded. The space houses new machinery and features a welding room, a carpentry and plastics room, a composites wet lab and more.

Engineering Student Design Center Tour

A gift to the Diane Bryant Engineering Student Design Center provides quality resources and manufacturing education to the students and staff of the College of Engineering. Consider giving today!
Photo(s)